01Portfolio briefing for the programme partner
A single document putting all five pilots side by side: stage, likelihood, economics, the specific ask of the partner for each one, and an honest restatement of the programme milestone.
02Two complete fleet electrification feasibility studies
Each one covering duty-cycle analysis from measured telematics, a ten-year total cost of ownership model, charging infrastructure sizing against metered depot load, and a phased conversion recommendation.
03Process and energy initiative cases
Measured baselines and investment cases for the water, compressed air and condition monitoring initiatives, each with capital cost, annual saving, payback and the CO2 effect.
04Depot charging capacity analyses
Metered load data across three and a half years turned into a straight answer on how much charging each site can host tonight with no grid work, and what an upgrade would buy.